SECTIONS CHANGE AS ALL NOVA PRODUCTS RE-BRANDED AS MAMMOTH    

InsulPro Manufacturing Ltd will now be manufacture NOVAtherm, NOVAfloor and NOVAhush polyester insulation ranges under the Mammoth brand.  All Mammoth product will be manufactured in accordance to current specifications for equivalent NOVA product as long as the product specifications are identical. BRANZ appraisals ##797 and 802 have been also updated to reflect the changeover to the Mammoth brand. The change will see 4 x InsulPro sections withdrawn to be replaced by 4 new Mammoth sections.

N.B. If you have recently specified any NOVA products, the next time you open your specification the system will warn you of changes and inform you that your section/s have been deleted. Masterspec advise you to then add the equivalent Mammoth section to your specification (see below), make the edits necessary to suit the project then delete the InsulPro section to avoid any confusion.

4710N InsulPro Thermal and Acoustic Insulation need to be replaced by 4710M Mammoth Thermal and Acoustic insulation

4711N InsulPro NOVAtherm and NOVAfloor Insulation need to be replaced by 4711 Mammoth thermal insulation

4721N InsulPro NOVAhush acoustic insulation need to be replaced by 4721M Mammoth acoustic insulation

5311N InsulPro NOVAhush acoustic ceiling tiles should be replaced by 5311M Mammoth NOVAhush Acoustic ceiling tiles

For any inquiries regarding the changes please contact InsulPro directly on info@insulpro.co.nz.

 

  »GOOGLE VERIFIED
  »ENGINEERING TERMS AND CONDITIONS
  »REVISITING OUR HERITAGE
  »FURTHER CHANGES PROPOSED TO NZBC C PROTECTION FROM FIRE
  »REDUCING PARTITION WALL FAILURE IN SEISMIC EVENTS
  »BUILDING CODE UPDATED REFERENCES
  »MEDIUM DENSITY HOUSING RESOURCE PAGE
  »SPECIFICATIONS HOW-TO
  »DETAILED ENGINEERING EVALUATION TOOLS FROM SESOC
  »BIM FOR ALL - DUMMIES OR NOT
  »MASTERSPEC'S PRODUCT RANGE SUPPORTS MULTI-DISCIPLINARY TEAMS
  »SPECIFICATIONS AND CONTRACTS
  »BUILDING ACT 2004 AMENDMENTS
  »SURFACE FIRE PERFORMANCE OF INSULATION IN PLENUMS AND DUCTS
  »CHANGES TO THE BUILDING ACT – HOW DO THEY AFFECT ARCHITECTS, DESIGNERS AND DESIGN/BUILD
  »WHAT IS THE PURPOSE OF A SPECIFICATION???
  »NZBC C PROTECTION FROM FIRE - AMENDMENTS DECEMBER 2013
  »AMENDMENTS TO NZS 4211
  »STRENGTHENING NEW ZEALAND’S STANDARDS SYSTEM – TRANSITION PROJECT
  »2014 INTERNATIONAL BIM REPORT
  »UPDATED GUIDANCE FOR EXEMPT BUILDING WORK
  »TACTILE GROUND SURFACE INDICATORS (TGSIS)
  »STREAMSIDE PROTECTION AND GUIDES TO RESTORATION
  »SEISMIC RESTRAINTS FOR GAS, WATER HEATERS & APPLIANCES
  »CHANGES TO NZBC C PROTECTION FROM FIRE - 1 JULY 2014
  »CHANGES TO H3.1 FOR SOLID TIMBER FRAMING
  »FIRE SAFETY AND DESIGN – FURTHER READING
  »AS 3566.2 WITHDRAWN BY STANDARDS AUSTRALIA BUT IN E2/AS1?
  »AIR CONDITIONING REFRIGERANT SAFETY
  »WHAT IS GOING ON WITH HEALTH & SAFETY?
  »FURTHER WORKED EXAMPLES TO ACCOMPANY THE SEISMIC DESIGN OF RETAINING STRUCTURES GUIDANCE
  »PASSIVE HOUSING – GENERAL DESIGN PRINCIPLES
  »SPECIFYING FIRE BLANKETS
  »DESIGN AND BUILD - REASONS FOR CONSENT DELAYS
  »AS/NZS 2312 SPLIT UP AND AMENDED
  »FIRE PERFORMANCE OF FLOOR COVERINGS LAID OUT
  »CODEMARK CERTIFICATION POPULAR WITH PRODUCT PARTNERS
  »LOW EMISSIVE GLASS COATINGS - SURFACE 2 OR 3 – WHAT SHOULD IT BE?
  »INTERIOR NOISE CONTROL - TRYING TO UNDERSTAND ACOUSTICS
  »MASTERSPEC INTERVIEW: ANDREW MAYNARD
  »DRAINAGE, LAYING OUT THE OPTIONS
  »ELECTRONIC LEAK DETECTION OF MEMBRANES
  »INTERIOR ELEMENTS - BUILDING CODE REQUIREMENTS CHECKLIST
  »NEW GENERIC SECTION 4239 SOFFIT CLADDING
  »SECTIONS CHANGE AS SOME INSULPRO PRODUCTS REBRANDED AS MAMMOTH
  »MASTERSPEC RELEASE 12 NEW SERVICES ENGINEERING WORK SECTIONS.
  »STRUCTURALLY FIXED CAVITY BATTENS
  »CHANGES TO THE LAMINEX GROUP
  »WORK SECTION UPDATES AND DELETIONS FOR JULY 2015
  »ALTERNATIVE TEST METHODS FOR ACHIEVING NZBC C GROUP NUMBERS.
  »CONCRETE SLABS - FREE JOINTS OR SHRINKAGE CONTROL JOINTS???
  »DRAINAGE GENERAL NAME CHANGE
  »ROOF SAFETY MESH - AS/NZS 4389 UPDATED
  »PLUMBING AND DRAINAGE - AS/NZS 3500.1 AND AS/NZS 3500.2 UPDATED
  »NEW BASIC SECTION FOR PLYWOOD AND PARTICLEBOARD FLOORS
  »GREEN BUILDING REQUIREMENTS IN THE RESIDENTIAL SECTOR
  »NEW SECTIONS FOR MASTERSPEC BASIC AND INTERIORS USERS
  »HEAT PUMP WATER HEATERS NOW AN OPTION
  »WELDING GALVANIZED OR THERMAL SPRAYED STEEL
  »MAJOR CHANGES TO THE CARPENTRY BASED SECTIONS IN MASTERSPEC BASIC AND INTERIORS
  »A COLLECTION OF COUNCIL DEVELOPMENT, SUBDIVISION AND ENGINEERING GUIDES
  »NEW NZS 4407 - ONE ROAD AGGREGATE STANDARD TO UNITE THEM ALL
  »PLUGGING INTO ELECTRIC CARS
  »PUTTING MORE INTO 2242 BACKFILLING
  »AS/NZS 3500.4 HEATED WATER SERVICES UPDATED
  »MAJOR CHANGES TO THE CONSTRUCTION CONTRACTS ACT
  »AS/NZS 1668.1 VENTILATION AND AIR-CON FIRE AND SMOKE CONTROL
  »HEALTH AND SAFETY AT WORK ACT 2015 AND THE SPECIFICATION
  »COMPATIBILITY AND ADHESION OF WET SEALS AND SILL TAPES IN WINDOW INSTALLATIONS
  »JMF TIMBER WINDOW AND DOOR JOINERY CAN BE SPECIFIED ON A ‘TEST’ BASIS
  »STEEL STRUCTURES - NZS 3404.1: 1997 VERSES NZS 3404.1: 2009
  »ASBESTOS REMOVAL NEW LICENCE REGIME
  »MBIE PRODUCT ASSURANCE SEMINARS FOR SUPPLIERS/MANUFACTURERS
  »RESIDENTIAL CONSTRUCTION HANDOVER
  »A BIG MONTH OF CHANGES TO STANDARDS
  »INTERNATIONAL BIM OBJECT STANDARD TO BE RELEASED
  »NON-COMPLIANT CONCRETE REINFORCEMENT
  »TIPS FOR SPECIFYING FIXED AUDIENCE SEATING
© 2017 Construction Information Limited
Construction Information Limited Construction Information
Powered by streamSWEET CMS  
Feedback