Twenty-eight Acceptable Solutions and ten Verification Methods for complying with the Building Code have been amended and will take effect from 1 January 2017.

Consultation on the amendments to the Acceptable Solutions and Verification Methods, as well as two new Acceptable Solutions, took place from 20 July to 31 August 2016. Ninety-two people submitted feedback on these proposals, which helped to refine and finalise the amendments.

Two proposed Acceptable Solutions, E2/AS4 Torch-on Membrane Systems for Roofs and Decks and E3/AS2 Internal Wet Area Membranes, require further development and will not be published at this time.

The following describes which version of an Acceptable Solution or Verification Method to use when submitting a complete application for a building consent:

  • Until 31 December 2016: use the existing version (prior to 1 January 2017 only the existing version is an Acceptable Solution or Verification Method)
  • From 1 January to 30 May 2017*: use either the existing version or the newly published version (during this transition period either version is an Acceptable Solution or Verification Method)
  • From 31 May 2017*: use the newly published version (the existing version is no longer an Acceptable Solution or Verification Method)

* An exception to this transition period is for D2/AS1, which is extended to 6 August 2017. From 7 August 2017, only the Amendment 7 version of D2/AS1 can be used as an Acceptable Solution. 

UPDATE - Since publishing the article MBIE have released further detail on the changes in the pipeline. These are:

Summary of changes

A brief description of the changes to each Acceptable Solution or Verification Method is given below:

  • NZS 4223 Parts 1 to 4 are updated to the latest versions in B1/AS1, and the structural glass barrier requirements in Part 3 are modified.


  • Figure 7.10 (c) in NZS 3604 is modified in B1/AS1, to clarify the requirements (in accordance with the latest test data).


  • Modifications in B1/VM1 – applying the hazard factor to buildings with natural frequencies greater than 0.67 in Canterbury and to the risk factor (Rs) for SLS in Canterbury – are deleted. NZS 3101 clause 9.3.9.4.13 is modified to limit the depth of precast units to 300mm and the overall depth to 400mm.


  • Formulae are corrected in B1/VM4, paragraphs 4.3.4 a) ii) and 3.3.2 b).
  • NZS 4223.2:2016 is cited as a means of compliance for the durability of insulating glass units (double glazing) 
  • Paragraph 1.1.2: clarification that an alternative solution or Verification Method can be used for buildings with complex features or specific fire engineering design.


  • Paragraph 3.4: NZS 4514 domestic smoke alarms can be used to extend travel distance in housing.


  • Paragraph 4.16.12: location of smoke dampers is clarified.


  • Paragraph 5.1.2: requirement for notional boundary between buildings only applies where there is sleeping use.


  • Paragraph 5.5.7: the tabulated method for calculating Unprotected Areas can be used.


  • Appendix C – Australian and European standards can be used for Group Numbers.
  • Section 2.1 on slip resistance of walking surfaces is revised and references AS 4586: 2013 ‘Slip resistance classification of new pedestrian surfaces’. Paragraph 1.2.1 includes a requirement for maximum vertical variations in flooring.
  • BS EN 14975: 2006 ‘Loft ladders – Requirements, marking and testing’ is referenced as an acceptable solution.
  • AS 1657: 2013 ‘Fixed platforms, walkways, stairways and ladders – Design, construction and installation’ replaces an earlier version.
  • Minor changes and corrections are made throughout the text for clarity.
  • The lift Standard EN 81-20:2014 is cited, with appropriate modifications for use in New Zealand, to incorporate modern technology and practices.
  • The transition period for introducing EN 81-20 aligns with its introduction internationally.
  • Six reference Standards are updated. Minor corrections are made to Table 1 and paragraph 9.0.6.
  • The code of practice CCANZ – CP 01: 2014 errata 1 January 2015 replaces the 2014 version.
    • Comment under paragraph 1.1.4 is corrected – clause E3 does not apply to buildings that are not Housing or Communal residential.
    • NZS 4223.3: 2016 Amendment 1 ‘Glazing in buildings – Human impact safety requirements’ replaces the 1999 version.
    • A comment is provided on asbestos in building materials.
    • Minor changes to Table 1 regarding barriers on stairways. A comment is provided on access to building services equipment mounted on roofs.
    • Requirements for opening windows are clarified in section 2.0.
    • Comments are modified to improve guidance on “occupant load” and “slopes”.
    • AS/NZS 2293.2 is updated to the latest version and NZS 4541 is cited.
    • Exit signs, sprinkler signage and electromagnetic compatibility are clarified (paragraphs 4.5.1, 5.4 and Appendix A respectively).
    • Suitable LED lighting is included as an acceptable means to recharge photo-luminescent signs.
    • 
The reference to AS/NZS 1229:2002 is corrected.
    • The minimum space requirements for laundries and laundries for persons with disabilities are clarified (paragraph 1.2 and Figures 1 and 2).
    • The minimum clear area for domestic kitchens and the associated requirements for facilities for persons with disabilities are clarified in G3/AS1 (Figure 1 and paragraphs 1.5.1 and 1.5.2).
    • AS/NZS 5601.1:2013 and the Workplace Exposure Standards are updated to the latest versions, including consequential changes to G4/AS1 paragraphs 2.4.1(c) and 3.0.1.
    • AS/NZS 5601.1:2013 is updated to the latest version, including consequential changes to G10/AS1 paragraph 5.0.1.
    • AS/NZS 5601.1:2013 is updated to the latest version.
    • 
Eight referenced Standards for pipe materials, design and installation, including AS/NZS 3500.1 and AS/NZS 3500.4, are updated to the latest versions and BS EN 1567:1999 is referenced.
    • Minor corrections, clarifications and consequential changes from updating Standards are made to G12/AS1 and G12/AS2.
    • 
Five referenced Standards for pipe materials, design and installation, including AS/NZS 3500.2, are updated to the latest versions and consequential changes are made to G13/AS1, G13/AS2 and G13/AS3.
    • Minor changes are made in G13/AS1 relating to air admittance valves.
    • Four referenced Standards for pipe materials and installation are updated to the latest versions.
    • NZS 4218:2009 replaces the 2004 version in H1/AS1 and H1/VM1. Overall the requirements in H1/AS1 do not change, but foil insulation is no longer within the scope of H1/AS1. 

    The Masterspec team will be updating our sections as necessary during the transition period. Please watch for Updates Available notices in your work sections and projects.

      »MYRTLE RUST - HELP SAVE OUR ICONIC NATIVE TREES
      »TRAFFIC SIGNS AND ROAD MARKINGS
      »CYBER CRIME: HOW ARCHITECTS, ENGINEERS AND CONTRACTORS MAY BE AT RISK
      »AS/NZS 60598.1 - LUMINAIRES TIMES TWO
      »REMOVING USER PRIVILEGES AND DELETING A USER
      »JNL J-FRAME SPECIFICATION UPDATE
      »NEW PRODUCT PARTNER, EXISTING WORK SECTIONS
      »A CONCLUSION ON THE INCLUSION - RISK OF SPONTANEOUS GLASS FAILURES
      »RESIDENTIAL POOLS AND THE NEW NZBC F9/AS1 AND F9/AS2
      »HEALTH & SAFETY AND EXPLOSIVES UPDATES
      »UPDATES TO, PLASTER BOARD, PAINTING & TREATMENT STANDARDS
      »BUILDING CODE AMENDMENTS 2017 OVERVIEW
      »MORE INFORMATION ON NZS 4223 AND NZS 3604 UPDATES
      »NEW RESTRICTIONS ON COMBUSTIBLE EXTERNAL CLADDING
      »NEW SLIP RESISTANCE AND AS 4586
      »AS/NZS 5601.1 AND THE AFFECT ON G4, G10 AND G11
      »AS/NZS 3500 AND THE AFFECT ON G12 AND G13
      »CHANGES TO H1 AND THE AFFECTS OF THE NEW NZS 4218
      »UPDATING WORK SECTIONS IN MASTERSPEC
      »STEEL REINFORCEMENT MESH FOR CONCRETE - CLARIFICATION
      »NEW ELECTRICAL STANDARDS
      »NEW AS/NZS 1252 STANDARDS FOR BOLTS, NUTS & WASHERS
      »SPECIFYING MEMBRANE LEAK TEST METHOD AT DESIGN STAGE
      »REFRIGERANTS AND REFRIGERATING SYSTEMS - NEW STANDARDS
      »NEW ACOUSTIC STANDARD AS/NZS 2107 PROMPTS OTHER CHANGES
      »MBIE AMEND 28 ACCEPTABLE SOLUTIONS AND 10 VERIFICATION METHODS
      »NEW GEOTECHNICAL ENGINEERING GUIDANCE FROM MBIE AND THE NZGS
      »CHANGES TO SEISMIC DESIGN REQUIREMENTS FOR SUSPENDED CEILINGS
      »NEW MBIE PRACTICE ADVISORIES ON NON-STRUCTURAL BUILDING ELEMENTS
      »CLARIFICATION ON TESTING OF GRADE 500E DUCTILE STEEL MESH
      »NEW STANDARD FOR PLAYGROUND EQUIPMENT AND SURFACING COMING INTO EFFECT
      »NEW POOL SAFETY LEGISLATION
      »ASBESTOS REMOVAL NEW CODE OF PRACTICE
      »NEW NZS 4246 INSULATION STANDARD
      »NZS 1170.5: 2004 NEW AMENDMENT
      »PHOTOVOLTAIC STANDARDS CHANGE
      »UPDATES TO GLAZING IN BUILDINGS STANDARDS NZS 4223
      »DESIGNING FOR COUNTER TERRORISM
      »MASTERSPEC TENDER FORMS UPDATED
      »AS/NZS 1170.2:2011 NEW AMENDMENT
      »NSW APARTMENT DESIGN GUIDE
      »DESIGNING SCHOOLS IN NEW ZEALAND
      »CONSTRUCTION CONTRACTS ACT NOW INCLUDES DESIGNERS, ENGINEERS, QS'S
      »THE GREENEST COMMERCIAL BUILDING IN THE WORLD
      »GOOD PRACTICE GUIDELINES - EXCAVATION SAFETY
      »CHANGES TO GENERIC SECTION 8430 FENCES
      »MASTERSPEC ELECTRICAL SECTIONS UPDATES
      »NEW SECTION 7628 VRF AIR-CONDITIONING SYSTEM
      »NEW FIRE SAFETY SYSTEMS SECTIONS
      »FIRE EXTINGUISHERS - MATCHING THE HAZARD
      »PASSIVE VENTILATION IN THE CLASSROOM – A NEW STUDY
      »NEW SECTION 7383 FIRE & SMOKE CURTAINS
      »NEW SECTION 7371 UNDERGROUND FIRE HYDRANTS
      »NEW SECTION 7372 FIRE HYDRANT SYSTEMS FOR BUILDINGS
      »NEW GLASS BARRIER REQUIREMENTS FROM 1 JUNE 2016
      »NOW YOU CAN HIGHLIGHT IN MASTERSPEC NEXTGEN2
      »MBIE - QUICK GUIDE TO PRODUCT SUBSTITUTION
      »COMPLAINTS ABOUT NON-COMPLIANT BUILDING PRODUCTS
    © 2017 Construction Information Limited
    Construction Information Limited Construction Information
    Powered by streamSWEET CMS  
    Feedback