For some time Masterspec has used the NZ Transport Agency (NZTA) documents:

  • MOTSAM.1: NZTA Manual of traffic signs and markings - Part 1: traffic signs
  • MOTSAM.2: NZTA Manual of traffic signs and markings - Part 2: markings

However these are gradually being replaced by this document:

  • NZTA TCD Manual: Traffic Control Devices Manual 

The NZTA TCD Manual has been in development for nearly 10 years and a lot of work is planned but not completed.  Some of the items in MOTSAM.1 and MOTSAM.2 are now covered in NZTA TCD Manual, but not all and not in full. This means any reference involving these documents, depending on detailed requirements, may involve just the MOTSAM documents or just the TCD Manual, or a combination of the two.  While not ideal it's difficult to avoid until the TCD Manual is completed.

As a result of this, Masterspec now references both the MOTSAM and TCD documents as they may have to be read together. However we believe in case of conflict the TCD Manual probably should take precedence, but this may be on a case by case basis.

The following Masterspec sections have been updated:

  • 5811  SIGNS & DISPLAYS  (available in Standard, Landscapes and Interiors)
  • 8261  ROADMARKINGS AND SIGNS  (available in Standard, Landscapes and Structural & Civil)

LINKS

MOTSAM.1

https://www.nzta.govt.nz/resources/motsam/part-1/motsam-1.html

MOTSAM.2

https://www.nzta.govt.nz/resources/motsam/part-2/motsam-2.html

NZTA TCD

https://www.nzta.govt.nz/resources/traffic-control-devices-manual/index.html

Share this article with your friends 

share linkedin
    share twitter   share facebook

 

  »NEW SUSTAINABLE AND GREEN BUILDING SECTIONS
  »ESD - SUSTAINABLE PROJECTS & MASTERSPEC
  »MYRTLE RUST - HELP SAVE OUR ICONIC NATIVE TREES
  »TRAFFIC SIGNS AND ROAD MARKINGS
  »CYBER CRIME: HOW ARCHITECTS, ENGINEERS AND CONTRACTORS MAY BE AT RISK
  »AS/NZS 60598.1 - LUMINAIRES TIMES TWO
  »REMOVING USER PRIVILEGES AND DELETING A USER
  »JNL J-FRAME SPECIFICATION UPDATE
  »NEW PRODUCT PARTNER, EXISTING WORK SECTIONS
  »A CONCLUSION ON THE INCLUSION - RISK OF SPONTANEOUS GLASS FAILURES
  »RESIDENTIAL POOLS AND THE NEW NZBC F9/AS1 AND F9/AS2
  »HEALTH & SAFETY AND EXPLOSIVES UPDATES
  »UPDATES TO, PLASTER BOARD, PAINTING & TREATMENT STANDARDS
  »BUILDING CODE AMENDMENTS 2017 OVERVIEW
  »MORE INFORMATION ON NZS 4223 AND NZS 3604 UPDATES
  »NEW RESTRICTIONS ON COMBUSTIBLE EXTERNAL CLADDING
  »NEW SLIP RESISTANCE AND AS 4586
  »AS/NZS 5601.1 AND THE AFFECT ON G4, G10 AND G11
  »AS/NZS 3500 AND THE AFFECT ON G12 AND G13
  »CHANGES TO H1 AND THE AFFECTS OF THE NEW NZS 4218
  »UPDATING WORK SECTIONS IN MASTERSPEC
  »STEEL REINFORCEMENT MESH FOR CONCRETE - CLARIFICATION
  »NEW ELECTRICAL STANDARDS
  »NEW AS/NZS 1252 STANDARDS FOR BOLTS, NUTS & WASHERS
  »SPECIFYING MEMBRANE LEAK TEST METHOD AT DESIGN STAGE
  »REFRIGERANTS AND REFRIGERATING SYSTEMS - NEW STANDARDS
  »NEW ACOUSTIC STANDARD AS/NZS 2107 PROMPTS OTHER CHANGES
  »MBIE AMEND 28 ACCEPTABLE SOLUTIONS AND 10 VERIFICATION METHODS
  »NEW GEOTECHNICAL ENGINEERING GUIDANCE FROM MBIE AND THE NZGS
  »CHANGES TO SEISMIC DESIGN REQUIREMENTS FOR SUSPENDED CEILINGS
  »NEW MBIE PRACTICE ADVISORIES ON NON-STRUCTURAL BUILDING ELEMENTS
  »CLARIFICATION ON TESTING OF GRADE 500E DUCTILE STEEL MESH
  »NEW STANDARD FOR PLAYGROUND EQUIPMENT AND SURFACING COMING INTO EFFECT
  »NEW POOL SAFETY LEGISLATION
  »ASBESTOS REMOVAL NEW CODE OF PRACTICE
  »NEW NZS 4246 INSULATION STANDARD
  »NZS 1170.5: 2004 NEW AMENDMENT
  »PHOTOVOLTAIC STANDARDS CHANGE
  »UPDATES TO GLAZING IN BUILDINGS STANDARDS NZS 4223
  »DESIGNING FOR COUNTER TERRORISM
  »MASTERSPEC TENDER FORMS UPDATED
  »AS/NZS 1170.2:2011 NEW AMENDMENT
  »NSW APARTMENT DESIGN GUIDE
  »DESIGNING SCHOOLS IN NEW ZEALAND
  »CONSTRUCTION CONTRACTS ACT NOW INCLUDES DESIGNERS, ENGINEERS, QS'S
  »THE GREENEST COMMERCIAL BUILDING IN THE WORLD
  »GOOD PRACTICE GUIDELINES - EXCAVATION SAFETY
  »CHANGES TO GENERIC SECTION 8430 FENCES
  »MASTERSPEC ELECTRICAL SECTIONS UPDATES
  »NEW SECTION 7628 VRF AIR-CONDITIONING SYSTEM
  »NEW FIRE SAFETY SYSTEMS SECTIONS
  »FIRE EXTINGUISHERS - MATCHING THE HAZARD
  »PASSIVE VENTILATION IN THE CLASSROOM – A NEW STUDY
  »NEW SECTION 7383 FIRE & SMOKE CURTAINS
  »NEW SECTION 7371 UNDERGROUND FIRE HYDRANTS
  »NEW SECTION 7372 FIRE HYDRANT SYSTEMS FOR BUILDINGS
  »NEW GLASS BARRIER REQUIREMENTS FROM 1 JUNE 2016
  »NOW YOU CAN HIGHLIGHT IN MASTERSPEC NEXTGEN2
  »MBIE - QUICK GUIDE TO PRODUCT SUBSTITUTION
  »COMPLAINTS ABOUT NON-COMPLIANT BUILDING PRODUCTS
© 2017 Construction Information Limited
Construction Information Limited Construction Information
Powered by streamSWEET CMS  
Feedback