Masterspec
05 Apr 2024
Understanding Project Scope and How to Specify Window Systems
It is vital that Movement and Deflection criteria are correctly defined in the Specification. We cannot over emphasize the importance of correctly...
04 Apr 2024
MBIE Building Consent System Review - Overview and Update
In July 2022, MBIE commenced a review of the building consent system, as part of the Building System Reforms to improve the consenting process. The...
07 Feb 2024
Building Code Updates 2023-2024
On 02 November 2023, MBIE announced updates to the Building Code Clauses relating to Protection from Fire, Plumbing and Drainage and Structure-...
30 Nov 2023
NZCIC Guidelines Responsibility Schedule Goes Digital
The new online tool enables real-time collaboration among multiple stakeholders, fostering efficiency and innovation in construction processes.
10 Nov 2023
BCA Requests to Modify Manufacturers Technical Content
mDocs allows the specifier to quickly access the latest version of a document uploaded by the manufacturer or supplier. Importantly, these detailed...
27 Sep 2023
Masterpec Specified: Award Winning Soaring Box House by Turner Road Architecture
The house’s unique design fits into the rural landscape. The house has a cantilevered structure and a soaring angular volume. The interior design is...
27 Sep 2023
Masterpec Specified: Award Winning Taharoto Lane by X Studio Architects
The development will have 19 units, including studio, office, and retail space. The residential units will have balconies with views of the city...
13 Sep 2023
Hallmark Group Opens Up About BPIR
Recently, Hallmark Group turned to Masterspec, a trusted name in compliance solutions, for guidance on their BPIR for fire doors. In this article, we...
06 Sep 2023
Al Bahr Towers in Abu Dhabi: Kinetic Architecture, Innovation and Sustainability
In the heart of Abu Dhabi's skyline, two iconic towers stand as shining examples of innovative architecture and sustainable design. The Al Bahr...
05 Sep 2023
Silica - Understanding the Risks
Over recent months, we have had several enquiries from designers in relation to industry concerns with silica-based building products and the...
18 Aug 2023
Masterspec: Your Partner in BPIR Product Review Compliance
The Building Regulation Act 2022 comes into force on 11th December 2023, requiring building product suppliers in New Zealand to provide baseline...
27 Jul 2023
Masterspec Partners with NZCIC & CSA to Digitise the NZCIC Guidelines
Masterspec, has been working with the New Zealand Construction Industry Council (NZCIC) and the Construction Sector Accord (CSA) in an exciting new...
24 Jul 2023
How Specifiers Reduce Risks by using Masterspec's Work Section Support
In the construction industry, collaboration is one of the keys to success. Masterspec, as a leader in providing specification solutions, has long...
24 Jul 2023
Belle View House Waiheke: An Innovative Design Response
The plan is for Belle View House to be situated on a Waiheke Island headland, the Belle View House will be an architectural marvel when completed,...
21 Jul 2023
Streamlined Documentation and Error Prevention with Masterspec
In the fast-paced world of architectural design and documentation, avoiding errors is paramount to the success of any project. Michael Pepper, from...
19 Jul 2023
Introducing New Building Product Information Requirements: Ensuring Compliance and Transparency
Leverage on Masterspec's expertise to meet the new Build Product Information Requirements (BPIR) requirements effective December 11, 2023. Our...
09 Jul 2023
Building Law Reforms 2022
Did you know that the Building Regulations 2022 will introduce new requirements for building products?
06 Jul 2023
Preparing a Specification
The specification is a fundamental part of the documentation set provided for the delivery of a construction project. The Building Act 2004 states...
06 Jul 2023
What is a Specification?
Some of the world's leading national specification bodies met at conference earlier this year. Representatives from twenty influential nations,...
13 May 2023
Enhanced User Experience (UX) with Two New Masterspec Features: Clause in Review and Clause Action & Date Stamp
We are pleased to announce the incorporation of two new features that are designed to enhance your user experience. Firstly, we have integrated the...

UNDERLAYS - NZS 2295 AMENDED

29 Nov 2017

Standards have published NZS 2295:2006 Amendment 1 (2017) Pliable, Permeable Building Underlays, apparently driven by the need for a Standard that reflected up-to-date test methods and products that are already in used by the building industry.  Although NZS 2295:2006 was developed to allow the use of synthetic wall underlays, this new amendment has added synthetic roof underlays.

Amendment 1 incorporates the following changes to NZS 2295:2006:

  • Inclusion of performance requirements, related test methods, and limitations of use for synthetic roofing underlays
  • Minor changes to specifications and limitations for wall underlays, including deletion of W1 class due to non-use
  • Updating reference documents.

NZS 2295:2006 is cited in NZBC AS/1, but the Amendment 1 (2017) is not, at least not yet.  This means that synthetic roofing underlays are an Alternative Solution to NZBC AS/1, however the amendment would be a good tool to show compliance and support an Alternative Solution.

There are a few new details in the amended Standard that are worth mentioning here:

Classification of building underlay types 

LOCATION  TYPE GRADE 
WALL  W2 Wall underlay Kraft/bituminous based Heavy grade
 W3 Wall underlay Synthetic based non-absorbent
 W4 Wall underlay Synthetic based absorbent
ROOF  R1 Roof underlay Kraft/bituminous based Heavy grade
 R2 Roof underlay Kraft/bituminous based Self-supporting
 R3 Roof underlay Synthetic based Heavy grade
 R4 Roof underlay Synthetic based Self-supporting

Note: W1 deleted, R3 and R4 added.

Clause 3.3.2 Amended list
Roofing underlay clause "Mechanical strength" the new list reads

  • R1 and R3 – shall be fully supported and only used when the roof pitch is equal to or greater than 10 degrees
  • R2 and R4 – when the roof pitch is equal to or greater than 10 degrees underlay is self-supporting to a maximum span of 1200 mm. When the roof pitch is below 10 degrees, the roof underlay shall be fully supported

Appendix C - Underlay applications
Table C2 Pliable roof underlay applications, has been amended to:

SPAN  SUPPORT WIND LOAD ZONE
Low/Medium High/Very High
Less than 1200mm Fully Supported R1/R3 R1/R3
Less than 1200mm Unsupported R2/R4 R2/R4
Over 1200mm Fully Supported R2/R3/R4 R2/R4

Note: R3 with over 1200mm span can only be used in Low/Medium wind zones.

Masterspec
The Masterspec generic section 4161 UNDERLAYS, FOIL AND DPC (all Masterspec systems except Minor) has been generally updated with, amongst other things:

  • the addition of underlay types, including synthetic roofing underlays, to allow easier cross referencing to the Standard and NZBC E2/AS1
  • the deletion of type W1 wall underlay in line with the new amendment
  • although the section still used NZBC E2/AS1 and NZS 2295:2006 as the basis, guidance has been added on the requirements of Amendment 1 for projects using synthetic roofing underlays
  • the critical roof pitch of 10° has been corrected in few instances.

Some related Masterspec branded sections have been updated to a lesser extent, these may be updated more in the future depending on the manufacturer/supplier requirements.

It would be reasonable to assume that at some time the new amendment will be cited in the Acceptable Solution.  If and when that happens Masterspec will communicate the changes to all users.