Adding scheduling
 

ADDING SCHEDULING TO EXISITING SPECIFICATIONS AND OFFICE MASTERS

NextGen2's new scheduling function automatically provides lists of all sections containing clause headings related to operation and maintenance, shop drawings, as built documents and warranties. Scheduling works by searching the specification for key words located within work section clause headings. If any are found the section containing the clause will be listed. All current Masterspec sections have been reviewed and standardised to support these key words. 

However you may have existing Office Masters or wish to clone existing work sections from older specifications yet to be updated with the correct clause headings. This page deals with how you can add clause functionality to Office Masters and change clause titles so that scheduling will pick up a section and add it to the appropriate specification schedule.

 Watch-the-video-now.jpg 

Watch the Masterspec Updates - Add Scheduling to Existing Specifications video

 

FOR CURRENT BUT INCOMPLETE PROJECTS

OPTION 1 – LEAVE AS IS

If you have already included the old General Sections in the project, it’s ok to complete the specification without incorporating the new scheduling functionality, just finish your specification as you have previously.

OPTION 2 – ADD SCHEDULING

If you have yet to add the General sections to the specification: 

  • Make sure you add the four updated General sections - these are

1235 Shop Drawings

1237 Warranties

1238 As Built Documentation

1239 Operation and Maintenance

  • Run the Update Manager to include the scheduling key phrases for existing sections – these will be highlighted by the Updates Available icon when you open your project

updates-available.jpg

Accept any clause heading around Shop Drawings, Warranties, As Built Documentation or Operation and Maintenance.

update-manager

These include the correct scheduling key words and phrases that will trigger adding the section into the correct schedule.

 

UPDATE AN OLD SECTION TO BE RECOGNISED BY THE SCHEDULING FUNCTION

If you'd like to clone an existing work section from an old specification into a new project you will need to ensure the section contains the correct clause headings to trigger the Scheduling function. There are two ways to do this

 

OPTION ONE: TRIGGER THE SCHEDULING FUNCTION WHEN A SCHEDULE-TYPE CLAUSE EXISTS

If your work section already contains a clause referring to either Shop Drawings, Warranties, As Built Documentation or Operations and Maintenance, all you need to is ensure the correct key words are present in the clause heading to trigger the Scheduling tool. The correct key words/phrases are:

  • WARRANTY
  • WARRANTY - MANUFACTURER/SUPPLIER
  • WARRANTY - INSTALLER/APPLICATOR
  • SHOP DRAWINGS
  • AS BUILT DOCUMENTS
  • INFORMATION FOR OPERATION AND MAINTENANCE
  • OPERATION AND MAINTENANCE MANUALS
  • MAINTENANCE CONTRACT PROPOSAL

Note that the wording MUST BE EXACT - 'Shop-Drawings' with a hyphen will not trigger the Scheduling tool.


OPTION TWO: ADD THE SCHEDULING FUNCTION BY ADDING A SCHEDULING CLAUSE

If your existing work does not contain a schedule clause but you wish to add one you can use a Clause Template in NextGen2. 

With the clause you are working on in EDIT mode add a clause containing the correct wording.

  • at an appropriate place in the Part 1 General tab of the section, select "Add a new Clause (Above or Below)
  • in the pop-up window make sure you have selected the Add Clause tab
  • Select from the drop-down list of Clause Templates the type of clause you would like to add
  • The system will populate the clause with pre-written text and guidance text for the clause
  • Select Save Clause - the clause will be inserted into the section and the numbering updated
  • Update the clause information to suit the project

Do not change the clause heading wording as this may result in Scheduling ignoring the section

add-clause.jpg


FOR OFFICE MASTERS

If you are updating an Office Master that includes General Sections then you need to replace them with the updated General sections.

    BEFORE YOU DELETE ANY SECTIONS ADD THE NEW SECTIONS TO YOUR OFFICE MASTER 

    Copy any changes you had made in the old General sections to the updated sections, then DELETE the old versions of the sections from the specification. Adding the updated sections will mean schedules will now be automatically created. Save your work, then check the schedules tab on Shop Drawings, Warranties, As Built and Operations & Maintenance to ensure everything from your specification is included in the new schedules. 

    Run the Update Manager on the Office Master to ensure clause headings include the correct key words and phrases.

     

    Watch-the-video-now.jpg

    Watch the Masterspec Updates - Add Scheduling to Existing specifications video

     

     

    *Scheduling is not available in Masterspec Minor or Masterspec Link

     

     

     

      »NEW FEATURES IN NEXTGEN2
      »NEXTGEN2'S NEW DOCUMENT CONTROL_AUDIT FORM
      »NEXTGEN2 - CREATING AND MANAGING YOUR APPENDIX
      »NEXTGEN2 - USING THE CONTACT SUPPLIER FUNCTION
      »COPYING AND PASTING TABLES FROM WORD TO NEXTGEN2
      »NEXTGEN2 NOW COMES WITH EDITOR NOTES
      »NEXTGEN2 - COMPLETING YOUR SPECIFICATION NEW
      »UPDATING YOUR SPECIFICATION IN NEXTGEN2
      »SCHEDULING IS HERE!
      »SCHEDULING - UPDATING OFFICE MASTERS
      »CREATE A NEW OFFICE MASTER BY CLONING AN EXISTING SPECIFICATION