Masterspec
31 Mar 2026
Masterspec Specified: 211 High Street by Ignite
211 High Street transforms the iconic Excelsior Hotel site into a high-quality, sustainable, commercial mixed-use building. The ground floor features...
25 Mar 2026
Why AI Changes How We Trust Construction Specifications
AI has not created the risk of inaccurate or misused construction specifications, but it has made that risk faster, easier to scale, and harder to...
04 Mar 2026
2025 Building Code Update and Building Product Specifications
On 28th July 2025, MBIE's Building Product Specifications (BPS) document came into effect. This document, to be read alongside the Acceptable...
19 Nov 2025
Masterspec Specified: Te Pae Christchurch Convention Centre
Te Pae Christchurch Convention Centre stands as a landmark civic and cultural facility in the heart of Christchurch, New Zealand. Designed by Woods...
15 Oct 2025
Masterspec Specified: Air New Zealand Hangar 4 by Studio Pacific Architecture
The project was designed to meet Green Star environmental standards and includes advanced cladding, roofing, and mechanical systems tailored for...
10 Oct 2025
Bridging the Gap: Empowering Better Specifications for Builders
At this year’s Constructive Conference in Auckland, we asked every delegate we spoke with: “What can we do to improve construction documentation and...
24 Sep 2025
NECO₂ – New Zealand’s Embodied Carbon Repository Goes Live
New Zealand’s construction sector has taken a major step providing New Zealand-centric carbon data with the launch of the first release of NECO₂ – the...
22 Sep 2025
Masterspec Specified: Award Winning Bryndwr House One by AO Architecture
Tucked into a secluded rear site behind a mature, tree-lined driveway in leafy Bryndwr, this new family home forms one half of a pair of residences...
22 Sep 2025
Masterspec Specified: Award Winning Flockhill Sugarloaf by Hierarchy Group
Nestled in the remote Craigieburn Valley of New Zealand’s Southern Alps, Sugarloaf at Flockhill is more than a restaurant — it’s an architectural...
12 Sep 2025
Masterspec Specified: Award Winning He Whare Hono ō Tūwharetoa by DCA Architects of Transformation
In the heart of Taupō, a landmark civic building is redefining the relationship between architecture, culture, and governance.
08 Sep 2025
Masterspec Specified: Award Winning Terrace 12C by Bassett-Smith Architecture
Terrace 12C is a residential development located in Tauranga, designed to maximise site efficiency while maintaining architectural individuality. The...
08 Sep 2025
Masterspec Specified: Award Winning Miller Residences by Oliver Andrew Associates
In the heart of Auckland, the Miller Residences by Oliver Andrew Associates stand as a refined example of contemporary multi-unit housing — where...
01 Apr 2025
Document Referencing and Scheduling with eCert
Our editor team has updated all Masterspec work sections which have references to environmental documents. Where environmental document references...
27 Mar 2025
Update Manager New Features
The new Update Manager features are designed to boost productivity when applying changes to updated work sections. Simplify work section updates with...
03 Mar 2025
CIL is Now Accepting Product Carbon Data for the National Embodied Carbon Data Repository for Construction.
CIL Masterspec is now accepting carbon information in the form of Environmental Product Declarations (EPDs) or Life Cycle Assessments (LCAs) from...
06 Jan 2025
Carbon 2025 and Beyond: Building a More Sustainable Future for NZ Construction
In July 2024, Construction Information Ltd (CIL) and the Building Research Association of New Zealand (BRANZ) announced a partnership to develop a...
01 Nov 2024
Introducing eCert: A Game-Changing Tool for Sustainable Construction
As the New Zealand construction industry increasingly focuses on sustainability and carbon reduction, there is a growing need for tools that can help...
26 Sep 2024
Masterspec Specified: Manawa House by Cube Architecture
"Masterspec has been an indispensable tool for our project Manawa House. During the specification, Masterspec streamlined our entire specification...
26 Sep 2024
Masterspec Specified: Award Winning Ligar Bay Bach by Young Architects
"Masterspec was used for providing a detailed, fully customised, specification as part of our comprehensive project documentation for the Ligar Bay...
25 Sep 2024
Masterspec Specified: Hilltop Home by Jon McAlpine Architecture
“Masterspec is a critical component in our studio. Its user-friendly platform and regular product specification updates, keep us constantly on the...

Enhanced User Experience (UX) with Two New Masterspec Features: Clause in Review and Clause Action & Date Stamp

13 May 2023

We are pleased to announce two fantastic new features that are set to improve your user experience. These updates will be rolled out later this month, and we are confident that they will be of help and value to you as continue to specify.

Firstly, we have implemented a powerful functionality that allows you to hold a clause "in review" without deleting it or disrupting clause numbering. This feature is beneficial not only for MasterKey subscribers but also for any specifier who needs the flexibility to edit and modify the specification as the project progresses. By placing a clause "in review," you can suspend it temporarily and then easily restore it whenever necessary. This enables ample time for discussions and deliberations while ensuring everyone knows the clause is not yet finalised. Within the specification, these specific clauses are highlighted and retained. All exports of the specification and MasterKey Keynotes will accurately reflect the clause status, even if you export before making your final updates. Additionally, the export function has been upgraded to remind you of any clauses that are still "in review."

Secondly, we have introduced a visual date stamp feature for every clause, documenting the last action performed on the clause, the user responsible for the action, and the date and time of the action. To access this information, simply hover over the relevant clause title while in edit mode. Please note that this feature is only available during the editing process within the Masterspec platform.

NEW FUNCTIONALITY #1: CLAUSE IN REVIEW

We have received requests over an extended period to incorporate this feature that enables specifiers to retain of a clause and its numbering within a section while it is under review. See the new feature below, which you will find located on the clause action menu located on the right-hand-side drop-down of any clause.
Clause in review Masterspec

NEW FUNCTIONALITY #2: CLAUSE ACTIONS & DATE STAMP OF LAST UPDATE

Another exciting update allows you to view the last, most recent action taken on any specification clause within your project. You can easily access this information by hovering over the relevant clause title but only within the "Edit" mode of the Masterspec platform.

Date and time stamp Masterspec

 

Look out for our upcoming update release scheduled for later May 2023 to experience these exciting new features first-hand. We firmly believe that they will improve your workflow and your overall user experience.

The team at Masterspec are constantly striving to provide you with the best possible tools, and we are confident that these additions will be invaluable to you. Should you have any questions or require further assistance, please do not hesitate to reach out to us using the feedback tab on far right of any Masterspec session.

Thank you for your continued support and feedback as we work to make Masterspec even better.