Masterspec
31 Mar 2026
Masterspec Specified: 211 High Street by Ignite
211 High Street transforms the iconic Excelsior Hotel site into a high-quality, sustainable, commercial mixed-use building. The ground floor features...
25 Mar 2026
Why AI Changes How We Trust Construction Specifications
AI has not created the risk of inaccurate or misused construction specifications, but it has made that risk faster, easier to scale, and harder to...
04 Mar 2026
2025 Building Code Update and Building Product Specifications
On 28th July 2025, MBIE's Building Product Specifications (BPS) document came into effect. This document, to be read alongside the Acceptable...
19 Nov 2025
Masterspec Specified: Te Pae Christchurch Convention Centre
Te Pae Christchurch Convention Centre stands as a landmark civic and cultural facility in the heart of Christchurch, New Zealand. Designed by Woods...
15 Oct 2025
Masterspec Specified: Air New Zealand Hangar 4 by Studio Pacific Architecture
The project was designed to meet Green Star environmental standards and includes advanced cladding, roofing, and mechanical systems tailored for...
10 Oct 2025
Bridging the Gap: Empowering Better Specifications for Builders
At this year’s Constructive Conference in Auckland, we asked every delegate we spoke with: “What can we do to improve construction documentation and...
24 Sep 2025
NECO₂ – New Zealand’s Embodied Carbon Repository Goes Live
New Zealand’s construction sector has taken a major step providing New Zealand-centric carbon data with the launch of the first release of NECO₂ – the...
22 Sep 2025
Masterspec Specified: Award Winning Bryndwr House One by AO Architecture
Tucked into a secluded rear site behind a mature, tree-lined driveway in leafy Bryndwr, this new family home forms one half of a pair of residences...
22 Sep 2025
Masterspec Specified: Award Winning Flockhill Sugarloaf by Hierarchy Group
Nestled in the remote Craigieburn Valley of New Zealand’s Southern Alps, Sugarloaf at Flockhill is more than a restaurant — it’s an architectural...
12 Sep 2025
Masterspec Specified: Award Winning He Whare Hono ō Tūwharetoa by DCA Architects of Transformation
In the heart of Taupō, a landmark civic building is redefining the relationship between architecture, culture, and governance.
08 Sep 2025
Masterspec Specified: Award Winning Terrace 12C by Bassett-Smith Architecture
Terrace 12C is a residential development located in Tauranga, designed to maximise site efficiency while maintaining architectural individuality. The...
08 Sep 2025
Masterspec Specified: Award Winning Miller Residences by Oliver Andrew Associates
In the heart of Auckland, the Miller Residences by Oliver Andrew Associates stand as a refined example of contemporary multi-unit housing — where...
01 Apr 2025
Document Referencing and Scheduling with eCert
Our editor team has updated all Masterspec work sections which have references to environmental documents. Where environmental document references...
27 Mar 2025
Update Manager New Features
The new Update Manager features are designed to boost productivity when applying changes to updated work sections. Simplify work section updates with...
03 Mar 2025
CIL is Now Accepting Product Carbon Data for the National Embodied Carbon Data Repository for Construction.
CIL Masterspec is now accepting carbon information in the form of Environmental Product Declarations (EPDs) or Life Cycle Assessments (LCAs) from...
06 Jan 2025
Carbon 2025 and Beyond: Building a More Sustainable Future for NZ Construction
In July 2024, Construction Information Ltd (CIL) and the Building Research Association of New Zealand (BRANZ) announced a partnership to develop a...
01 Nov 2024
Introducing eCert: A Game-Changing Tool for Sustainable Construction
As the New Zealand construction industry increasingly focuses on sustainability and carbon reduction, there is a growing need for tools that can help...
26 Sep 2024
Masterspec Specified: Manawa House by Cube Architecture
"Masterspec has been an indispensable tool for our project Manawa House. During the specification, Masterspec streamlined our entire specification...
26 Sep 2024
Masterspec Specified: Award Winning Ligar Bay Bach by Young Architects
"Masterspec was used for providing a detailed, fully customised, specification as part of our comprehensive project documentation for the Ligar Bay...
25 Sep 2024
Masterspec Specified: Hilltop Home by Jon McAlpine Architecture
“Masterspec is a critical component in our studio. Its user-friendly platform and regular product specification updates, keep us constantly on the...

FIRE HYDRANT SYSTEMS FOR BUILDINGS - NEW SECTION    

01 Jun 2016

Introducing a new Masterspec section 7372 FIRE HYDRANT SYSTEMS FOR BUILDINGS which is based around NZS 4510 Fire Hydrant Systems For Buildings and relates to the design, approval, installation and commissioning of fire hydrant systems for buildings.

The primary function of these fire hydrant systems to NZS 4510, is for fire service use when attending and dealing with fire emergencies in buildings. These consist of a hydrant main (pipe) installed in a building and usually permanently charged with water from a pressurised supply sufficient for fire fighting. The pipe has a building hydrant inlet (BHI) on the outside of the building and a number of building hydrant outlet assemblies (includes landing valves) at specified points, usually on the inside of the building. The fire service pumping appliances (usually the fire engine) connects to the BHI, water is reticulated to building hydrant outlets (usually landing valves) to which hoses can be connected. Where the pressure available from fire service pumps is not able to deliver the required flow pressures, built in booster pumps will be required.

Fire hydrant systems generally mean that fire fighters can deploy more quickly, efficiently and safely within a larger building, and have a more dependable water supply closer to the fire.

CHARGED HYDRANT MAIN

Charged hydrant main, Charged riser and Wet riser, amount to much the same thing being the pipe that is kept charged with water. The only difference being risers are largely vertical and mains more neutral on their direction. These are the types that NZS 4510 covers. Uncharged risers (dry risers) are not covered by NZS 4510 and generally no longer permitted for new buildings, except where specifically designed for special purposes and approved by the hydrant system certifier.

DESIGN AND CERTIFYING

Hydraulic design of the system is to be by a suitable qualified Design Engineer.

A Hydrant System Certifier (HSC) must to NZS 4510:

  • certify the final system construction/installation
  • approve the ongoing testing & maintenance contract
  • provide preliminary approval of basic (system) design decisions

BUILDING CODE REQUIREMENTS

The requirements to provide fire hydrant systems for buildings is derived from NZBC C Protection from Fire, in particular, directly from NZBC C/AS2 to C/AS7 section 2.2 Fire Safety Systems, and by specific design from NZBC C/VM2, 4.8 Design Scenario FO (to satisfy C5.5).

Fire hydrant systems are not described, like most other fire safety system types, in NZBC F7 Warning Systems, it is described in Acceptable Solutions Appendix A, A2.1 and defined as:

  • Type 18 – Fire hydrant systems for buildings
  • Fire hydrant systems shall comply with NZS 4510.

Only NZBC C/AS1 (SH) has no requirements for fire hydrant systems. All other Acceptable Solutions have requirements but sometimes allow one or two exemptions under section 2.2:

  • Type 18 building fire hydrant system, unless the Fire Service hose run distance from Fire Service vehicular access to any point on any floor is less than 75 m. or,
  • Type 18 building fire hydrant system in all cases where the height from the Fire Service attendance point to any floor is greater than 15.0 m. Otherwise, a Type 18 system is required unless the Fire Service hose run distance from Fire Service vehicular access to any point on any floor is less than 75 m.

The Acceptable Solutions Table 2.0 is a convenient reference showing a range of building conditions and fire systems required.

LOCATION OF HYDRANTS

Hydrant locations to NZS 4510.

NZBC requires the building hydrant inlet (BHI) shall have ready access from street level and be protected from the effects of fire including debris falling from upper floors.

NZS 4510 indicates in multi-storeyed buildings locate building hydrant outlets (landing valves) within a protected lobby. Location within stairwells, while permissible, creates congestion in a fire, and reduces the effective reach of standard length hose lines because of the need to base the fire attack from the landing below.

Hydrants can form part of the buildings fire hose reel supply.

For some location/spatial requirements refer to NZS 4510:

  • Figure 4 – Measurement of hose lengths
  • Figure 5 – Outlet assembly spatial requirements
  • Figure 6 – BHI standard requirements (BHI Building hydrant inlet)

DURING CONSTRUCTION OR DEMOLITION

It is recommended that internal building hydrant systems should be operational during both construction and demolition periods as both activities provide a heightened risk of fire. NZS 4510 specifies that during construction, the hydrant system must be enlivened progressively (including pumps, if required) as construction advances.