Masterspec
01 Apr 2025
Document Referencing and Scheduling with eCert
Our editor team has updated all Masterspec work sections which have references to environmental documents. Where environmental document references...
27 Mar 2025
Update Manager New Features
The new Update Manager features are designed to boost productivity when applying changes to updated work sections. Simplify work section updates with...
03 Mar 2025
CIL is Now Accepting Product Carbon Data for the National Embodied Carbon Data Repository for Construction.
CIL Masterspec is now accepting carbon information in the form of Environmental Product Declarations (EPDs) or Life Cycle Assessments (LCAs) from...
06 Jan 2025
Carbon 2025 and Beyond: Building a More Sustainable Future for NZ Construction
In July 2024, Construction Information Ltd (CIL) and the Building Research Association of New Zealand (BRANZ) announced a partnership to develop a...
01 Nov 2024
Introducing eCert: A Game-Changing Tool for Sustainable Construction
As the New Zealand construction industry increasingly focuses on sustainability and carbon reduction, there is a growing need for tools that can help...
26 Sep 2024
Masterspec Specified: Manawa House by Cube Architecture
"Masterspec has been an indispensable tool for our project Manawa House. During the specification, Masterspec streamlined our entire specification...
26 Sep 2024
Masterspec Specified: Award Winning Ligar Bay Bach by Young Architects
"Masterspec was used for providing a detailed, fully customised, specification as part of our comprehensive project documentation for the Ligar Bay...
25 Sep 2024
Masterspec Specified: Hilltop Home by Jon McAlpine Architecture
“Masterspec is a critical component in our studio. Its user-friendly platform and regular product specification updates, keep us constantly on the...
06 Aug 2024
NZ Building Code Changes: Type 1 Domestic Smoke Alarms
In Masterspec NOTES June 2024, we provided commentary around the changes to the NZ Building Code relating to domestic smoke alarms.
18 Jul 2024
New Industry Initiative to Reduce Carbon Emissions of New Zealand Buildings
A new industry-led initiative aims to reduce the environmental impact of Aotearoa New Zealand’s buildings, which contribute up to 20% of the national...
04 Jul 2024
Masterspec Announces New MasterKey4 for Revit 2025 Enhancements
Streamlined Workflows and Improved Collaboration with MasterKey4. We are excited to announce the latest update to MasterKey4 for Revit 2025, designed...
04 Jun 2024
Building Code Updates 2023-2024
This month we have published amendments in response to building code updates. The 2023-24 NZBC changes were published by MBIE on the 2 November 2023,...
04 Jun 2024
NZ Building Code Changes: Type 1 Domestic Smoke Alarms
From November 2023 the Building Code Acceptable Solutions for Protection from Fire (C/AS1 and C/AS2) have been amended to make Type 1 interconnected...
05 Apr 2024
Understanding Project Scope and How to Specify Window Systems
It is vital that Movement and Deflection criteria are correctly defined in the Specification. We cannot over emphasize the importance of correctly...
04 Apr 2024
MBIE Building Consent System Review - Overview and Update
In July 2022, MBIE commenced a review of the building consent system, as part of the Building System Reforms to improve the consenting process. The...
30 Nov 2023
NZCIC Guidelines Responsibility Schedule Goes Digital
The new online tool enables real-time collaboration among multiple stakeholders, fostering efficiency and innovation in construction processes.
10 Nov 2023
BCA Requests to Modify Manufacturers Technical Content
mDocs allows the specifier to quickly access the latest version of a document uploaded by the manufacturer or supplier. Importantly, these detailed...
27 Sep 2023
Masterspec Specified: Award Winning Taharoto Lane by X Studio Architects
The development will have 19 units, including studio, office, and retail space. The residential units will have balconies with views of the city...
27 Sep 2023
Masterspec Specified: Award Winning Soaring Box House by Turner Road Architecture
The house’s unique design fits into the rural landscape. The house has a cantilevered structure and a soaring angular volume. The interior design is...
13 Sep 2023
Hallmark Group Opens Up About BPIR
Recently, Hallmark Group turned to Masterspec, a trusted name in compliance solutions, for guidance on their BPIR for fire doors. In this article, we...

In Hot Water?

27 Nov 2018

In response to some specifier requests we have added to the hot and cold water sections details on hot water temperatures and instantaneous electric water heaters (similar to gas continuous flow units).

Hot Water Temperatures

Due to some BCA's wanting hot water temperatures listed on consent documents, Masterspec is adding a clause to help set this out. Temperature requirements come from NZBC G12/AS1, 6.14 Safe Water Temperatures, but it is more complex than it first appears. One thing to keep in mind is that G12/AS1 is largely written around storage hot water heaters, although maximum temperatures still apply. Boiling units are excluded from all these requirements.

Water Heater Temperatures

Storage water heaters are to store water at not less than 60°C to NZBC G12/AS1, 6.14.3 Legionella Bacteria. Legionella can grow between 20 to 50°C and survive in temperatures normally up to 55°C, but at 60°C Legionella bacteria dies in about 30 minutes. Non-storage heaters (flow throughs, instantaneous etc) do not require a minimum temperature as they are not storing water, particularly not at the Legionella critical development temperatures. NZBC G12/AS1, 6.14.4 also requires 60°C (or alternative sterilising system) to be maintained in flow and return circulating pipe systems as the pipes are effectively storing potentially large amounts of warm/hot water.

Temperatures at the outlet

Water temperature at the outlet (usually a tap) is defined by NZBC G12/AS1, 6.14.1 Maximum Temperature, and although not directly stated this relates to scald times (see below).  To get the full picture, you have to read what this clause says and what it does not say, hence the complexity.

Basically G12/AS1, 6.14.1 covers a hot water piping system, with temperature controls where necessary (tempering valve etc), that is to provide water at the outlet at the following temperatures:

  • For personal hygiene fixtures (showers, baths, wash hand basins etc) temperatures to be close to but not to exceed:
    • 45°C - for early child hood centres, schools, elderly facilities, hospitals, psychiatric or disabled institutions.
    • 55°C - for personal hygiene fixtures in all other buildings.

The key words to focus on are "personal hygiene fixtures"  which means fixtures such as showers, baths, wash hand basins, bidets etc. in all situations (refer G12/AS1, 6.14.1 comment 2). This is where it gets complex, personal hygiene is covered in G1/AS1, which includes showers, baths, wash hand basins, bidets etc. but does not include kitchen sinks (and appliances), laundry tubs (and appliances), cleaners sinks, industrial fixtures etc. So those fixtures that are not included can be classified as non-personal hygiene fixtures. As G12/AS1, 6.14.1 is silent on non-personal hygiene fixtures it can be deduced that there is no restriction on maximum temperature (related to scalding).

So for non-personal hygiene fixtures something like the following statement could be used to describe the hot water temperature at the outlet:

  • For non-personal hygiene fixtures (kitchen sinks and equipment, laundry tubs, cleaners sinks, industrial fixtures etc) temperatures are:
    • Unrestricted - direct from water heater, approx. 60°C, must be less than 65°C (for kitchen sinks and equipment, laundry tubs, cleaners sinks etc) - in all buildings.
    • Unrestricted - direct from water heater not tempered (for industrial fixtures and specific items etc) - in all buildings.

Simple right?  No!  It is all subject to the hot water system design, water heating types and required temperatures and scald times.

Scald Times

Virtually any hot water is capable of severe scalding, that is a 2nd or 3rd degree burns, it just depends on time and skin condition. Lower temperatures reduce the risk of scalding by increasing the length of time it would take to get a burn by effectively providing enough time to react to the heat and withdraw from it. For fixtures with the primary purpose of skin cleaning, the Code reduces temperatures, which in turn increases reaction times. This is particularly so in areas where there is expected to be concentrations of people with reduced/impaired reaction times or at risk skin condition (young children, elderly, disabled etc.).

 Period to receive severe scald burn (approximate)*
 TEMPERATURE  PERIOD
 45ºC  More than 1 hour
 55ºC  17 - 20 seconds
 60ºC  3 - 5 seconds
 65ºC  2 seconds
 70ºC  Instantaneous
 * - Represents 2nd degree burns to adult, sources vary about times

 

For non-personal hygiene fixtures (kitchen sinks and equipment, laundry tubs, cleaners sinks, industrial fixtures etc) where skin cleaning is not the primary purpose temperatures above 55°C may be desirable or for industrial processes required.

In domestic situations approximately 60°C (preferably just below) may be OK for rinsing greasy dishes, but it would be extremely dangerous for it to exceed say 65°C.

High temperature industrial processes may be different, as safety measures and equipment should prevent skin contact.

Hot Water System Design

System design starts with the water heater, either storage heater or instantaneous heaters (flow through etc). The storage heater outlet will usually, depending on energy source, initially provide water at or just over 60°C, and then normally via a tempering valve the temperature would be reduced to a required fixture temperature, say 55°C. Instantaneous heaters can use tempering valves but many of them are equipped to directly deliver water at a maximum prescribed fixture temperature without a tempering valve.

Issues arise if mixed temperatures are required or desired. Obviously a single storage heater providing water at 55°C to all fixtures in the building is probably going to be the cheapest and easiest system to provide. A mixed temperature system will get more complex needing multiple hot water lines and possibly multiple tempering valves (or multiple heaters), or even a flow and return system.

It is highly likely the mixed temperature system will need designing and documenting, showing how the different temperatures will be achieved and where the extra pipes (or extra heater) will go and which fixtures they serve and at what temperature.

Instantaneous Electric Water Heaters

Instantaneous electric water heaters are non-storage units, usually very compact, single or 3 phase and high amperage. They only heat water that flows through the unit which is activated by a tap being turned on. These types of heaters are particularly effective for remote low-use fittings (say whb) with limited space for a conventional water heater and where higher power costs are offset by heat losses from long pipe runs. The lower amperage heaters tend to work best with low-flow taps/fittings.

Most units do not require separate controls for, temperature (tempering valves), expansion or pressure, under normal conditions.  All that is usually required, in close proximity, is a 2 or 3 phase power supply of higher than average amperage plus a cold water feed with an isolating valve.

Masterspec Sections

Masterspec has added to the hot and cold water sections a clause detailing hot water temperature requirements.  Also to these sections, clauses on instantaneous electric water heaters have been added to the range of water heater option already able to be specified. There have been some very minor tweaks to guidance notes in the electrical sections to also allow for instantaneous electric water heaters.