Masterspec
18 Jul 2024
New Industry Initiative to Reduce Carbon Emissions of New Zealand Buildings
A new industry-led initiative aims to reduce the environmental impact of Aotearoa New Zealand’s buildings, which contribute up to 20% of the national...
04 Jul 2024
Masterspec Announces New MasterKey4 for Revit 2025 Enhancements
Streamlined Workflows and Improved Collaboration with MasterKey4. We are excited to announce the latest update to MasterKey4 for Revit 2025, designed...
04 Jun 2024
Building Code Updates 2023-2024
This month we have published amendments in response to building code updates. The 2023-24 NZBC changes were published by MBIE on the 2 November 2023,...
04 Jun 2024
NZ Building Code Changes: Type 1 Domestic Smoke Alarms
From November 2023 the Building Code Acceptable Solutions for Protection from Fire (C/AS1 and C/AS2) have been amended to make Type 1 interconnected...
05 Apr 2024
Understanding Project Scope and How to Specify Window Systems
It is vital that Movement and Deflection criteria are correctly defined in the Specification. We cannot over emphasize the importance of correctly...
04 Apr 2024
MBIE Building Consent System Review - Overview and Update
In July 2022, MBIE commenced a review of the building consent system, as part of the Building System Reforms to improve the consenting process. The...
30 Nov 2023
NZCIC Guidelines Responsibility Schedule Goes Digital
The new online tool enables real-time collaboration among multiple stakeholders, fostering efficiency and innovation in construction processes.
10 Nov 2023
BCA Requests to Modify Manufacturers Technical Content
mDocs allows the specifier to quickly access the latest version of a document uploaded by the manufacturer or supplier. Importantly, these detailed...
27 Sep 2023
Masterpec Specified: Award Winning Taharoto Lane by X Studio Architects
The development will have 19 units, including studio, office, and retail space. The residential units will have balconies with views of the city...
27 Sep 2023
Masterpec Specified: Award Winning Soaring Box House by Turner Road Architecture
The house’s unique design fits into the rural landscape. The house has a cantilevered structure and a soaring angular volume. The interior design is...
13 Sep 2023
Hallmark Group Opens Up About BPIR
Recently, Hallmark Group turned to Masterspec, a trusted name in compliance solutions, for guidance on their BPIR for fire doors. In this article, we...
06 Sep 2023
Al Bahr Towers in Abu Dhabi: Kinetic Architecture, Innovation and Sustainability
In the heart of Abu Dhabi's skyline, two iconic towers stand as shining examples of innovative architecture and sustainable design. The Al Bahr...
05 Sep 2023
Silica - Understanding the Risks
Over recent months, we have had several enquiries from designers in relation to industry concerns with silica-based building products and the...
18 Aug 2023
Masterspec: Your Partner in BPIR Product Review Compliance
The Building Regulation Act 2022 comes into force on 11th December 2023, requiring building product suppliers in New Zealand to provide baseline...
27 Jul 2023
Masterspec Partners with NZCIC & CSA to Digitise the NZCIC Guidelines
Masterspec, has been working with the New Zealand Construction Industry Council (NZCIC) and the Construction Sector Accord (CSA) in an exciting new...
24 Jul 2023
How Specifiers Reduce Risks by using Masterspec's Work Section Support
In the construction industry, collaboration is one of the keys to success. Masterspec, as a leader in providing specification solutions, has long...
24 Jul 2023
Belle View House Waiheke: An Innovative Design Response
The plan is for Belle View House to be situated on a Waiheke Island headland, the Belle View House will be an architectural marvel when completed,...
21 Jul 2023
Streamlined Documentation and Error Prevention with Masterspec
In the fast-paced world of architectural design and documentation, avoiding errors is paramount to the success of any project. Michael Pepper, from...
19 Jul 2023
Introducing New Building Product Information Requirements: Ensuring Compliance and Transparency
Leverage on Masterspec's expertise to meet the new Build Product Information Requirements (BPIR) requirements effective December 11, 2023. Our...
09 Jul 2023
Building Law Reforms 2022
Did you know that the Building Regulations 2022 will introduce new requirements for building products?

NZ Building Code Changes: Type 1 Domestic Smoke Alarms

04 Jun 2024

What has Changed?

From November 2023 the Building Code Acceptable Solutions for Protection from Fire (C/AS1 and C/AS2) have been amended to make Type 1 interconnected smoke alarms the minimum fire safety system for new built homes and substantial renovations, citing NZS 4514:2021 – Interconnected smoke alarms for Houses.

With the changes, smoke alarms are now required to be installed to ALL bedrooms/ sleeping areas, living spaces, hallways and landings within a household unit and must be interconnected, either wireless or hard-wired, so that when one activates, all alarms sound. The standard allows for either 10-year long-life battery-powered or 240V mains powered alarms.

References to Type 1 domestic smoke alarms have been removed from the Building Code Acceptable Solutions for Warning Systems (F7/AS1).

The changes are subject to a 12-month transition period ending on 01 November 2024. Until then designers and builders can choose to use either the new documents or the previous version to demonstrate compliance with the Building Code and where building consent applications will be submitted prior to the end of the transition period.

Guide to the Changes

Below are the key points of the changes to the acceptable solutions- it is important to read NZS 4514:2021 interconnected smoke alarms for houses for more detail.

  • Equipment required must be either 10 year long-life battery-operated (non-removable/sealed) or 240v mains powered, interconnected smoke alarms.
  • All smoke alarms must meet compliance standards such as BS EN 14604, AS3786, UL 217, CAN/ULC S531 or ISO 12239.
  • Where more than one smoke alarm is needed to meet the requirements of this standard, these alarms shall be interconnected so that when one activates, all smoke alarm devices in the household unit will sound. The interconnection between alarms may be wired or wireless.
  • Smoke alarms shall be located in all bedrooms, living spaces, hallways and landings within the building.
  • In a multi-level household, there shall be at least one smoke alarm on each level.
  • All smoke alarms must have a hush and test button.
  • Smoke alarms shall be located on or near the ceiling.
  • Where a kitchen or scullery is separated from the living spaces and hallways by doors that can be closed, an alarm specified by its manufacturer as suitable for a kitchen shall be located in the kitchen. This may be a heat alarm to avoid nuisance activations.

Why Interconnected Smoke Alarms?

Smoke alarms are interconnected so that when one activates, all the smoke alarm devices in the house will sound at the same time. 

Heat alarms provide an additional method of fire detection as they react to the build-up of temperature from a fire.  Bathrooms, laundries, garages and non-separated kitchens are optional locations for alarms and heat alarms are considered the best option for these spaces.

If using both smoke alarms and heat alarms in a house they are all required to be interconnected.

New Masterspec Generic Section

This month Masterspec have published a new generic work section to assist designers with the specification of these new systems.

7352 Type 1 Domestic Smoke Alarm System

The section details requirements for installation, maintenance, and commissioning of interconnected domestic smoke alarm systems, and also includes information on power supply (batteries, wiring etc.) and any heat alarms or sensory stimulation devices that may need to be incorporated into the system.

The new section is available in: Standard, Services, Basic, Interiors