Masterspec
01 Apr 2025
Document Referencing and Scheduling with eCert
Our editor team has updated all Masterspec work sections which have references to environmental documents. Where environmental document references...
27 Mar 2025
Update Manager New Features
The new Update Manager features are designed to boost productivity when applying changes to updated work sections. Simplify work section updates with...
03 Mar 2025
CIL is Now Accepting Product Carbon Data for the National Embodied Carbon Data Repository for Construction.
CIL Masterspec is now accepting carbon information in the form of Environmental Product Declarations (EPDs) or Life Cycle Assessments (LCAs) from...
06 Jan 2025
Carbon 2025 and Beyond: Building a More Sustainable Future for NZ Construction
In July 2024, Construction Information Ltd (CIL) and the Building Research Association of New Zealand (BRANZ) announced a partnership to develop a...
01 Nov 2024
Introducing eCert: A Game-Changing Tool for Sustainable Construction
As the New Zealand construction industry increasingly focuses on sustainability and carbon reduction, there is a growing need for tools that can help...
26 Sep 2024
Masterspec Specified: Manawa House by Cube Architecture
"Masterspec has been an indispensable tool for our project Manawa House. During the specification, Masterspec streamlined our entire specification...
26 Sep 2024
Masterspec Specified: Award Winning Ligar Bay Bach by Young Architects
"Masterspec was used for providing a detailed, fully customised, specification as part of our comprehensive project documentation for the Ligar Bay...
25 Sep 2024
Masterspec Specified: Hilltop Home by Jon McAlpine Architecture
“Masterspec is a critical component in our studio. Its user-friendly platform and regular product specification updates, keep us constantly on the...
06 Aug 2024
NZ Building Code Changes: Type 1 Domestic Smoke Alarms
In Masterspec NOTES June 2024, we provided commentary around the changes to the NZ Building Code relating to domestic smoke alarms.
18 Jul 2024
New Industry Initiative to Reduce Carbon Emissions of New Zealand Buildings
A new industry-led initiative aims to reduce the environmental impact of Aotearoa New Zealand’s buildings, which contribute up to 20% of the national...
04 Jul 2024
Masterspec Announces New MasterKey4 for Revit 2025 Enhancements
Streamlined Workflows and Improved Collaboration with MasterKey4. We are excited to announce the latest update to MasterKey4 for Revit 2025, designed...
04 Jun 2024
Building Code Updates 2023-2024
This month we have published amendments in response to building code updates. The 2023-24 NZBC changes were published by MBIE on the 2 November 2023,...
04 Jun 2024
NZ Building Code Changes: Type 1 Domestic Smoke Alarms
From November 2023 the Building Code Acceptable Solutions for Protection from Fire (C/AS1 and C/AS2) have been amended to make Type 1 interconnected...
05 Apr 2024
Understanding Project Scope and How to Specify Window Systems
It is vital that Movement and Deflection criteria are correctly defined in the Specification. We cannot over emphasize the importance of correctly...
04 Apr 2024
MBIE Building Consent System Review - Overview and Update
In July 2022, MBIE commenced a review of the building consent system, as part of the Building System Reforms to improve the consenting process. The...
30 Nov 2023
NZCIC Guidelines Responsibility Schedule Goes Digital
The new online tool enables real-time collaboration among multiple stakeholders, fostering efficiency and innovation in construction processes.
10 Nov 2023
BCA Requests to Modify Manufacturers Technical Content
mDocs allows the specifier to quickly access the latest version of a document uploaded by the manufacturer or supplier. Importantly, these detailed...
27 Sep 2023
Masterspec Specified: Award Winning Taharoto Lane by X Studio Architects
The development will have 19 units, including studio, office, and retail space. The residential units will have balconies with views of the city...
27 Sep 2023
Masterspec Specified: Award Winning Soaring Box House by Turner Road Architecture
The house’s unique design fits into the rural landscape. The house has a cantilevered structure and a soaring angular volume. The interior design is...
13 Sep 2023
Hallmark Group Opens Up About BPIR
Recently, Hallmark Group turned to Masterspec, a trusted name in compliance solutions, for guidance on their BPIR for fire doors. In this article, we...

Supporting exposed insulation above exposed sprinklers

02 May 2019

Masterspec has received advice, via a subscriber, from a sprinkler system certifier concerned with the installation of non self-supporting insulation when positioned above or in close proximity to exposed sprinkler heads, particularly in a roof/ceiling situation.

Where exposed flexible non-supporting insulation is installed at roof level above a ceiling, the effects of its sagging needs to be considered to ensure concealed space fire sprinkler head coverage is not compromised.  Practice Note NFPA13 A8.5.4.1 states, in part, "… and attached to the ceiling/roof in such a manner that it will not fall out during a fire prior to sprinkler activation".

It is noted that plastic strapping commonly used is insufficient to prevent flexible insulation sagging during a fire prior to sprinkler activation, due to plastics losing their structural integrity at relatively low temperatures.  Also, it is not considered a good long-term solution to tightly pack insulation into the space to omit the need for specific support.  Likewise, when exposed insulation is installed above walls from ceiling to floor/roof, it may need support to prevent collapse during a fire onto the ceiling space sprinklers.  Ideally, they need to be spaced far enough away to prevent collapsed insulation obstructing the sprinkler heads.

Masterspec has reviewed the insulation work sections (25 in total) and added standard clauses (or in some cases updated existing clauses).  As a result, the plastic strapping tape clauses have been updated to include reference to NZBC E2/AS1 9.1.8.5 which covers requirements for stud spacing for drained cavities. Also, when exposed insulation is over exposed sprinkler heads it is recommended that galvanized wire or wire netting insulation support be provided to avoid the risk of a fire event affecting the sprinkler head's performance.

Finally, wire netting clauses have been added or updated to cover roof / ceiling situations where wire netting is installed over purlins or under joists / purlins, to support flexible non self-supporting insulation.

For further information refer to the appropriate insulation work section.