Masterspec
05 Apr 2024
Understanding Project Scope and How to Specify Window Systems
It is vital that Movement and Deflection criteria are correctly defined in the Specification. We cannot over emphasize the importance of correctly...
04 Apr 2024
MBIE Building Consent System Review - Overview and Update
In July 2022, MBIE commenced a review of the building consent system, as part of the Building System Reforms to improve the consenting process. The...
07 Feb 2024
Building Code Updates 2023-2024
On 02 November 2023, MBIE announced updates to the Building Code Clauses relating to Protection from Fire, Plumbing and Drainage and Structure-...
30 Nov 2023
NZCIC Guidelines Responsibility Schedule Goes Digital
The new online tool enables real-time collaboration among multiple stakeholders, fostering efficiency and innovation in construction processes.
10 Nov 2023
BCA Requests to Modify Manufacturers Technical Content
mDocs allows the specifier to quickly access the latest version of a document uploaded by the manufacturer or supplier. Importantly, these detailed...
27 Sep 2023
Masterpec Specified: Award Winning Taharoto Lane by X Studio Architects
The development will have 19 units, including studio, office, and retail space. The residential units will have balconies with views of the city...
27 Sep 2023
Masterpec Specified: Award Winning Soaring Box House by Turner Road Architecture
The house’s unique design fits into the rural landscape. The house has a cantilevered structure and a soaring angular volume. The interior design is...
13 Sep 2023
Hallmark Group Opens Up About BPIR
Recently, Hallmark Group turned to Masterspec, a trusted name in compliance solutions, for guidance on their BPIR for fire doors. In this article, we...
06 Sep 2023
Al Bahr Towers in Abu Dhabi: Kinetic Architecture, Innovation and Sustainability
In the heart of Abu Dhabi's skyline, two iconic towers stand as shining examples of innovative architecture and sustainable design. The Al Bahr...
05 Sep 2023
Silica - Understanding the Risks
Over recent months, we have had several enquiries from designers in relation to industry concerns with silica-based building products and the...
18 Aug 2023
Masterspec: Your Partner in BPIR Product Review Compliance
The Building Regulation Act 2022 comes into force on 11th December 2023, requiring building product suppliers in New Zealand to provide baseline...
27 Jul 2023
Masterspec Partners with NZCIC & CSA to Digitise the NZCIC Guidelines
Masterspec, has been working with the New Zealand Construction Industry Council (NZCIC) and the Construction Sector Accord (CSA) in an exciting new...
24 Jul 2023
How Specifiers Reduce Risks by using Masterspec's Work Section Support
In the construction industry, collaboration is one of the keys to success. Masterspec, as a leader in providing specification solutions, has long...
24 Jul 2023
Belle View House Waiheke: An Innovative Design Response
The plan is for Belle View House to be situated on a Waiheke Island headland, the Belle View House will be an architectural marvel when completed,...
21 Jul 2023
Streamlined Documentation and Error Prevention with Masterspec
In the fast-paced world of architectural design and documentation, avoiding errors is paramount to the success of any project. Michael Pepper, from...
19 Jul 2023
Introducing New Building Product Information Requirements: Ensuring Compliance and Transparency
Leverage on Masterspec's expertise to meet the new Build Product Information Requirements (BPIR) requirements effective December 11, 2023. Our...
09 Jul 2023
Building Law Reforms 2022
Did you know that the Building Regulations 2022 will introduce new requirements for building products?
06 Jul 2023
Preparing a Specification
The specification is a fundamental part of the documentation set provided for the delivery of a construction project. The Building Act 2004 states...
06 Jul 2023
What is a Specification?
Some of the world's leading national specification bodies met at conference earlier this year. Representatives from twenty influential nations,...
13 May 2023
Enhanced User Experience (UX) with Two New Masterspec Features: Clause in Review and Clause Action & Date Stamp
We are pleased to announce the incorporation of two new features that are designed to enhance your user experience. Firstly, we have integrated the...

Building Code Updates 2023-2024

07 Feb 2024

On 02 November 2023, MBIE announced updates to the Building Code Clauses relating to Protection from Fire, Plumbing and Drainage and Structure- Acceptable Solutions and Verification Methods.

Transition Periods

Each of the updates became effective on 02 November 2023. It does not apply to building consent applications submitted prior to 02 November 2023. These updates are mostly subject to a transition period, whereby designers and builders can choose to use either the new documents or the previous version to demonstrate compliance with the Building Code and where building consent applications will be submitted prior to the end of the transition period.

MBIE have published a summary of what has changed, the specific transition periods and included useful links to detailed content as follows:

The Key Changes


Protection from fire

The Ministry of Business, Innovation and Employment (MBIE) has amended Acceptable Solutions C/AS1, C/AS2, F7/AS1 and Verification Method C/VM2 to improve the safety of people from fire.

We have cited new versions of standards for the:

  • design of sprinkler systems
  • fire alarm systems
  • interconnected smoke alarms
  • smoke control in air-handling systems.

Interconnected smoke alarms

The amended Acceptable Solutions C/AS1 and C/AS2 now cite NZS 4514: 2021 for the installation of interconnected smoke alarms to improve the fire safety in new residential homes.

The transition period for these changes is 12 months, ending on 1 November 2024.

Fire safety system standards

New versions of the standards are already available on Standards New Zealand's website. MBIE sponsors free access to the fire alarm and interconnected smoke alarm standard.

Plumbing and drainage

MBIE has amended the acceptable solutions and verification methods for E1 Surface Water, G12 Water Supplies, and G13 Foul Water. These changes support the provision of plumbing and drainage services which comply with the Building Code and help meet the safety and wellbeing objectives in the Building Act 2004.

These changes are the latest in a series of continuous improvements to ensure the Building Code compliance pathways for the plumbing sector are fit for purpose and up to date. Updates like these ensure New Zealanders have safe and reliable plumbing systems.

Changes to Acceptable Solution G12/AS1 include measures to lower the maximum hot water temperature delivered at the tap for most buildings from 55°C to 50°C and the introduction of additional temperature control devices to give plumbers more ways to limit hot water temperatures. These changes do not apply to the hot water used for kitchen or laundries nor do they apply to the temperature of hot water in the storage tank. The changes apply only to personal hygiene taps and baths in new buildings and new plumbing work. The G12/AS1 update also includes reducing the lead content in plumbing products.

The transition period for these changes is 12 months, ending on 1 November 2024 with the exception of lead in plumbing. This will have an extended transition date until 1 September 2025.

Plumbing and drainage standards

Key to these amendments is the adoption of the latest version of the AS/NZS 3500 plumbing and drainage standards as part of the compliance pathways. MBIE participated in the development of these standards. The new versions of the standards include a number of New Zealand-specific requirements meaning that several of the previous New Zealand Building Code modifications to the standards are no longer required. These standards are cited as compliance pathways in several acceptable solutions.

Structure

MBIE has modified the citation of the New Zealand Standard NZS 3101.1: 2006 within B1/VM1 Paragraph 3.1.1. The change deletes Clause 18.7.4.4 of this Standard from the verification method and means that the use of the standard for the design of the supports of hollow-core floors is now considered to be an alternative solution.

This change to B1/VM1 comes into effect on 2 November 2023, with no transition period.


Next Moves

We recommend that specifiers and product partners become familiar with the new requirements outlined under the above NZBC Clauses.

For specifiers, this means getting an in depth understanding of the evidence pathway required to display compliance with the Building Code and liaising with key specialist consultants on the impact of the changes.

For product partners, this may require the development or procurement of alternative products or systems to meet the new requirements. In addition, this may need to be supported by updated product information, test data and supporting documentation such as CodeMark/ Appraisals and updates to existing Masterspec sections.

For Masterspec, over the next few months we will be incorporating the updated general high-level requirements into non-branded and branded product partner sections. Further detailed product changes to branded sections will then be incorporated in consultation with product partners and prioritised as the information is received.


Reference:

https://www.building.govt.nz/about-building-performance/all-news-and-updates/updates-to-the-building-code-have-been-published/